Barry’s Electrical was called in to install a power point for the pool equipment in a shed housing the pump and filter equipment.IMG_2250

We asked the owner to dig the trench and they did a good job but were hampered by the tough ground and by their tools. We brought along our shovel and crowbar to complete the trench to 500mm deep. We then installed the new service to the pool shed and also installed the earth bond required to the pool shell and future fencing.

The job was completed in less than 3 hours and slightly over the estimated price due to the tough digging required.